Bid-phase concepts through construction drawings
Service
Temporary Shoring Design
Temporary shoring systems are developed around the realities of excavation sequencing, adjacent improvements, and contractor access.
When this is needed
Temporary shoring design for basement excavations, construction access, and challenging site support conditions.
Useful when excavation sequencing, adjacent improvements, access constraints, existing structures, or field conditions affect cost, schedule, or buildability.
Tieback, raker, cantilever, and braced excavation systems
Support for changed field conditions and construction-phase coordination
Systems and deliverables
Practical outputs for project teams.
Coordinated design documents and calculations for review, pricing, and construction.
Early system studies that clarify feasibility before scope and pricing harden.
Details aligned with access, staging, temporary works, and field sequence.
Responsive engineering through submittals, revisions, and changed conditions.
Related proof
Selected project examples
Private Development6th & Bixel6th & Bixel supports proof around adaptive excavation support, soldier pile and tieback shoring, and changed field conditions.
Private Development1201 S. Hope1201 S. Hope is useful proof for shoring redesign, high-rise residential excavation support, and Metro-adjacent coordination.