Education

Glendale Community College

Glendale Community College preserves a current-site education example involving permanent shoring, hillside terracing, DSA review, and drilled-pile foundation excavation.

Retaining wallsEarth retention systemsStructural design and coordination
ClientHMC
MarketEducation
SystemsRetaining walls, Earth retention systems, Structural design and coordination

Project context

Project profile for Glendale Community College, preserving current site content about permanent shoring wall design for a hillside campus science building.

Working for the project architect, HMC, Cefali & Associates endeavored to create a permanent shoring wall that would relieve earth pressure from the proposed new science building.

The temporary retained heights allowed for excavation of the new building's foundations, including drilled piles.

The necessity and vision of the architect for terracing up the hillside created unique corner conditions. Close coordination with the building structural engineer, Saiful Bouquet, helped work through many complex scenarios.

The project was reviewed and approved by DSA. The project was managed by Gafcon and the shoring was installed by Shoring Engineers.

Engineering challenges

Site conditions that shaped the work.

Project context

Permanent shoring wall for a hillside science building

Engineering condition

Temporary retained heights supporting drilled-pile foundation excavation

Coordination factor

DSA-reviewed education project with complex terraced corner conditions